A 36 m² stand for HEXAGON at the World Nuclear Exhibition, Paris Nord Villepinte, 28–30 November 2023. It was delivered by the team that now designs and fabricates under the Echo Expo name.

The project

WNE is the global trade show for the civil nuclear industry, held in Hall 7 at Paris Nord Villepinte. The build was specified as follows.

36 sqm nuclear industry exhibition stand at the World Nuclear Exhibition, Paris Nord Villepinte, with a suspended backlit logo canopy, LED lit elevated platform and three demonstration podiums
The 36 m² stand at the World Nuclear Exhibition, Paris Nord Villepinte — the LED strip runs the full edge of the elevated platform.

Nuclear is a credibility industry, and the stand has to carry it

Civil nuclear buying decisions run on long timescales and are made by engineers and procurement teams inside utilities, EPC contractors and national programmes. Nobody at WNE buys on impulse. The stand exists to make a company look like a credible long-term supplier, and the details that do that are unglamorous: square construction, clean joints, even lighting, and finishes that look deliberate rather than assembled.

That is why the podiums were fabricated with integrated closets rather than draped, and why the logo was backlit and die-cut rather than printed. On a 36 m² footprint surrounded by much larger national and corporate stands, build quality is the only differentiator available.

What the venue actually requires — and where a design usually fails

WNE’s architectural regulations are stricter than many European shows, and three of them catch designs regularly:

Plans go to the organiser’s appointed assessor for approval well before the show — roughly six weeks ahead for a late-November edition — and anything hung from the hall structure can only be installed by the venue’s own technical teams, with a stability report from a certified company.

The rule most foreign contractors miss

Building in France with a crew from outside France triggers a legal obligation that has nothing to do with stand design. Workers posted to French soil must be declared in advance through the SIPSI portal, and the exhibitor — not only the contractor — is responsible for ensuring it has been done. A copy of the declaration must be provided.

If it has not been done, the labour inspectorate can suspend work on site or cancel participation in the show. It is a paperwork step that costs nothing and, missed, can stop a build on the Saturday before opening. Ask any contractor quoting you for a French show whether they file it.

Why it matters

This puts civil nuclear and energy technology into our record, alongside our oil and gas work at Gastech and fire protection at NAEPEC. It also adds a fourth Paris project, alongside SIAL, JEC World and Maison & Objet.

Services delivered

Frequently asked questions

Do you build at Paris Nord Villepinte?

Yes — WNE, SIAL and JEC World among others. Trucks are not permitted inside the pavilions and all vehicles must be pre-registered, so deliveries are planned around the venue’s access system rather than improvised.

Can we have a raised floor?

Yes, and it is worth it for cable management and for lighting details like recessed LED strips. Just budget the accessibility ramp into the layout from the start — it has to sit inside your own area.

Do you handle the French posted-worker declaration?

It is a legal requirement for any crew posted to France, and it is part of how a French build is planned rather than an afterthought. Ask us about it when you brief the project.

Looking for a WNE stand builder?

Official event information is published by the organiser at world-nuclear-exhibition.com. Tell us the venue, the dates and the stand size, and we will come back with a design and a build plan. Talk to us about your stand, or see our work in France.