Get Your Quote for Expo Design
Please let us Know Your Requirements and
get your free quote for exhibition design with
Free 3D Stand Design & Amazing Concepts
Request Your Free Exhibition Stand Quotation
Planning to exhibit at a trade show? Request a free quotation from Echo Expo today. We design and build custom exhibition stands that match your brand, budget and event goals – with free 3D concepts, competitive pricing and complete project support from first sketch to final dismantle.
What happens next. Send us the event, your stand size, the hall or booth number, and your design if you already have one. We return an itemised quotation covering construction, furniture, electrics, graphics, freight and installation, normally within a few working days. If you do not have a design yet, we produce a free 3D concept first and quote against it.
What the quotation includes. Every element is priced separately: stand structure and flooring, graphics production, furniture, lighting, AV and LED, freight and customs clearance, installation, on-site supervision and dismantling. Nothing appears as a surprise extra during build-up.
Who builds it. We fabricate in our own workshops in Milan and Casablanca and install with our own team, so the people who quote your stand are the people who build it. We deliver across Europe and the Middle East, at venues including Fiera Milano, Messe Frankfurt, Deutsche Messe Hannover, Fira Barcelona, IFEMA Madrid, Bologna Fiere and Veronafiere.
What to send us, and why each item changes the price
A quotation is only as good as the brief behind it. These six things let us price a stand properly instead of guessing, and every one of them moves the number.
1. The show, the hall and the stand number
Not just the show name. The hall decides the rules — ceiling height, rigging points, floor loading, whether there is a goods lift and how far it is from the loading bay. A first-floor stand costs more to build than a ground-floor stand of the same size, because everything arrives by lift on someone else’s schedule.
2. The area and how many sides are open
36 m² in a row of stands and 36 m² on a corner are different jobs. An island open on four sides has no back wall to hang anything on, so storage, graphics and the technical rack all have to be designed into the middle of the space.
3. What has to happen on the stand
Private meeting rooms, a bar, a demonstration area, heavy product on the floor, a storeroom that locks. Tell us the awkward one first. A 400 kg machine or a product that needs water changes the structure, not the decoration.
4. Your graphics and brand assets
Vector logos and print-resolution images. If they do not exist yet, say so — it is a normal answer and we plan for it rather than discovering it three weeks out.
5. Whether the stand is used once or several times
A stand built to be reused is engineered differently from one built for a single show. It costs more the first time and much less every time after. If you exhibit three times a year, say so at the quotation stage — not after the first build.
6. Your deadline, honestly
Not the show date — the date your organiser closes orders. Most venues stop taking electrical and rigging orders around three weeks before the show and charge a surcharge after that. At Messe Frankfurt, for example, the cut-off is 22 days and late orders carry a 25% express surcharge.
What an itemised quotation from us actually contains
Not a single figure with “stand build” written next to it. Every quotation we issue is broken down so you can see what you are paying for and remove anything you do not want:
- Design and 3D visualisation — plan, elevations and photorealistic renders before anything is cut
- Structure — walls, ceiling elements, raised floor if any, by material and finish
- Graphics — panel by panel, with the print method named
- Furniture, lighting, AV and LED — listed as individual items, hire or purchase stated
- Freight and customs — road or sea, ATA Carnet where it applies
- Installation and dismantling — crew, days, and who supervises
- Venue services — electrical connection in kW, water, compressed air, rigging
If a line is not in the quotation, it is not in the price. That is the point of itemising it.
How long it takes
| Budget indication | Same day or next working day |
| Itemised quotation | 2–3 working days |
| Quotation with 3D design | 4–5 working days |
| Revised design after your feedback | 2 working days |
Common questions before you ask for a quotation
Do you charge for the design?
No. Design and 3D visualisation come with the quotation. You see the stand before you commit to it.
Can you quote if I do not know my stand number yet?
Yes. Give us the show, the area and how many sides are open, and we will quote on that. The stand number changes details, not the shape of the price.
Will you work to a budget I give you?
Yes, and it saves everyone a round trip. A figure lets us design something buildable instead of designing twice. Read our guidance on where to save money on a stand without it looking cheap.
Do you handle the venue paperwork?
Yes — rigging approval, floor loading, electrical declarations and waste separation are part of every project. See our guide to calculating your stand’s electrical load.
What if my show is in three weeks?
Tell us immediately rather than filling in a form. Short lead times are possible; they are only impossible once the organiser’s ordering deadline has passed.
Related: What we deliver · Documented projects with areas and booth numbers · Freight, customs and venue compliance
Secure Your Stand Space Early
Maximize savings with early booking
Planning ahead is always a smart move when preparing for an exhibition. By booking your stand space early, you unlock several advantages that go beyond cost savings. Most importantly, early reservations give you access to the best pricing options and prime locations on the show floor, which helps maximize your brand’s visibility.
Finalize Your Stand Design Ahead of Time
Get a free 3D stand design to visualize and value-engineer your booth
Once you confirm your participation, we provide a free 3D stand design tailored specifically to your brand, objectives, and budget. This visual preview allows you to see exactly how your booth will look and function on the exhibition floor—well before production begins.
Apply Smart, Budget-Wise Solutions
Save more with expert technical guidance
Beyond design, our experienced technical team works closely with you to maximize your return on investment. We recommend intelligent build strategies, modular stand systems, and sustainable materials that help lower costs while increasing long-term usability.
Exhibition stand quotation — common questions
What do you need to prepare a quotation?
The event, your stand size, the hall or booth number, and your design if you already have one. If there is no design yet we produce a free 3D concept first and quote against it.
How long does a quotation take?
Normally a few working days from receiving the stand size and design. Complex multi-level or multi-country builds take longer because freight and venue approvals have to be priced accurately.
What is included in the quotation?
Stand structure and flooring, graphics production, furniture, lighting, AV and LED, freight and customs clearance, installation, on-site supervision and dismantling. Each element is priced separately so nothing appears as a surprise extra during build-up.
Do you charge for the 3D design?
No. The initial 3D stand concept is free. We design from your brief, or work from an approved design you already hold.