What actually changes upstairs
The goods lift becomes the whole project
On the ground floor a truck backs up to the hall and the crew wheels material straight in. Upstairs, everything passes through a goods lift shared with every other upper-floor exhibitor in that hall. The lift has a door size, a floor area and a weight limit, and those three numbers quietly redesign your stand. Panels have to fit the lift, not the truck. A 3-metre wall that travels beautifully by road is useless if the lift car is 2.4 metres deep.Floor loading is lower, and it is enforced
Upper floors carry less distributed weight than a ground slab. Heavy product, stone, machinery and dense timber structures may face restrictions, or the venue may refuse them outright. This is a structural limit, not a negotiation.Queueing replaces driving
Your access slot gets you to the lift lobby, not to your stand. From there you are in a queue, and a queue is a thing you cannot compress by working harder.Waste has to come back down
Offcuts, packaging and pallets all return by the same lift. A build that generates a lot of waste on the ground floor generates a lot of lift journeys upstairs.How the design should respond
- Size every component to the lift car, and confirm the lift dimensions in writing before drawing anything
- Increase the proportion finished off site — the fewer trips, the better
- Choose lighter systems: aluminium frame over solid timber, fabric over rigid panel, hired furniture over transported furniture
- Design out the waste — panels cut to size in the workshop mean no offcuts to carry back down
- Flat-pack everything that can be flat-packed, because lift area is the constraint, not truck volume
What it is worth
Upper floors are not a consolation prize. They are often quieter, cheaper per square metre, and used by organisers for conference-adjacent space and meeting-heavy exhibitors. If your show objective is scheduled meetings rather than passing footfall, upstairs can be the better room. The mistake is taking an upper-floor space at a ground-floor price assumption and discovering the difference at build-up.What we do differently upstairs
At CPHI Milan 2026 we are building nine stands across six halls, four of them on the first floor, on a two-day build. We engineered the first-floor stands around the lift from the first sketch — component sizes set by the car, more pre-assembly, and a delivery sequence that assumes queueing rather than hoping against it. On a two-day build with four stands upstairs, the first hour is the whole margin. That is not a slogan, it is arithmetic: lose the first lift slot and there is no later slack to absorb it.Questions to ask the organiser before you commit
- What are the goods lift internal dimensions and weight limit?
- What is the floor loading limit in kg per m²?
- Does the venue book lift access in slots, and how does it allocate them?
- Is there a separate waste route, or does it come back through the lift?
- Are there height restrictions lower than the ground floor?
Part of the exhibitor guide series. Start with the technical manual checklist — eleven things with deadlines attached.
Frequently Asked Questions
Why does a double-deck stand need a goods lift?
To move catering, stock and equipment to the upper floor safely during the show without carrying loads up the stairs.
Do double-deck stands need extra approval?
Yes. Organisers treat them as complex structures and ask for structural calculations, a risk assessment and a method statement before the build.
Can you build double-deck stands?
Yes. We design and build two-storey stands, including stairs, balustrades and goods lifts, and prepare the documents the organiser requires.
When should we brief you for a double-deck stand?
Ideally four to six months before the show, so the 3D concept, the organiser’s approval and production all fit comfortably. Shorter timelines are possible for modular or smaller stands.